The new office and distribution facility is a combination of a pre-engineered metal and metal frame construction with a masonry veneer. The office portion of the building has executive and sales offices, a materials library, and open office plan. The warehouse has storage for multiple pallets of flooring, five loading docks, and two at-grade truck bays.
Photography: Ryan Hainey